Shilshole 15Apr14 * SG162 * Dive index * Mission links
Based on low voltage useage over previous 10 dives:
    dives remaining   : 902 (44.5 days at current dive duration)
    projected end date: 31-May-2014 02:37:36 (to 15% capacity)

Based on high voltage useage over previous 10 dives:
    dives remaining   : 945 (46.6 days at current dive duration)
    projected end date: 02-Jun-2014 05:29:32 (to 15% capacity)

High voltage pack usage


Low voltage pack usage