SG162 completed dive 4 at 03/12/08 21:38 to 6 m in 16 minutes, covering 0.1 km over ground. 3 errors, 224 retries. Next call due 03 Dec 21:55. Battery remaining 99.6% (high)/99.8% (low).
|
SG162 completed dive 23 at 11/12/08 17:20 to 106 m in 53 minutes, covering 0.4 km over ground. 0 errors, 0 retries. Next call due 11 Dec 18:14. Battery remaining 97.6% (high)/98.6% (low).
|
SG162 completed dive 22 at 02/02/10 18:18 to 100 m in 51 minutes, covering 0.1 km over ground. 0 errors, 1 retries. Next call due 02 Feb 19:09. Battery remaining 98.2% (high)/97.3% (low).
|