PortSusan 23Jul08.01 * SG119 * Dive index * Mission links * Dive 20 * Raw log
prev dive * next dive * dive
• Previous call tries 1 • 33.59 of 147.00 AH used of 24V (77.15% remains)
• Previous NAKs 0, Timeouts 0 • 21.91 of 122.20 AH used of 10V (82.07% remains)
• Surface angle -73.4 deg, depth 0.38 m • Intended pitch -18.1 deg, speed -10.000 cm/s
VBD pumped to 600.00 (SM_CC=600)
• GPS1 time: 9 s • bottom range 36.7 m at 81.4 m, depth 118 m (150 m grid)
• GPS2 time: 10 s • Transponder ping count: 0
• Time spent turning 0 s

Statistics * Plot
t(s) depth(m) w(cm/s) num pts t(s) GC phase pitch roll VBD pit rol VBD volts
ctl(cm) t(s) A pos(AD) rate t(s) A pos(AD) rate ctl(cc) t(s) A pos(AD) rate eff r e r e r e pitrollvbd flags
29 end surface: CONTROL_FINISHED_OK
29 begin dive
31 - - - 121 VBD -1.00 - - 862 - - - 2075 - -146.6 -86.78 - 2999 - - - - - - - - - - -
123 3.2 -7.4 16 158 roll -1.00 10.93 0.156 2445 144.8 2.38 0.090 3487 593.3 -146.6 -17.45 - 3843 -48.4 - - - - - - - - - -
293 28.8 -12.9 40 297 done -1.00 - - 2446 - 2.30 0.064 2076 -613.5 -146.6 - - 3843 - - - - - - - - - - -
499 56.8 -13.3 57 504 roll -1.00 - - 2445 - 2.35 0.081 3486 600.0 -146.6 - - 3844 - - - - - - - - - - -
543 62.6 -12.6 59 547 done -1.00 - - 2446 - 2.33 0.067 2074 -606.0 -146.6 - - 3844 - - - - - - - - - - -
870 99.7 -11.0 75 874 roll -1.00 - - 2445 - 2.35 0.085 3484 600.0 -146.6 - - 3844 - - - - - - - - - - -
942 end dive: BOTTOM_OBSTACLE_DETECTED
942 begin apogee
949 108.1 11.2 81 1066 done -0.23 0.98 0.084 2614 172.4 - - 2240 - - 112.22 0.809 3245 -5.3 0.072 - - - - - - - - -
1067 end apogee: CONTROL_FINISHED_OK
1067 begin climb
1069 111.5 - 93 1194 roll 1.00 1.50 0.035 2892 185.3 2.58 0.092 839 -543.0 146.6 112.93 0.778 2646 -5.3 0.077 - - - - - - - - -
1289 86.9 17.9 110 1293 done 1.00 - - 2892 - 2.42 0.075 2268 590.5 146.6 - - 2646 - - - - - - - - - - -
1608 36.2 15.1 129 1612 roll 1.00 - - 2892 - 2.40 0.098 3660 580.0 146.6 - - 2646 - - - - - - - - - - -
1866 7.0 -0.1 164 1993 VBD 1.28 0.30 0.053 2950 193.3 2.33 0.072 2243 -608.2 369.3 119.95 0.741 1994 -5.4 0.005 - - - - - - - - -
1993 end climb: SURFACE_DEPTH_REACHED
1994 begin surface coast
2028 end surface coast: CONTROL_FINISHED_OK
2028 begin surface
SM 0.23 - - - - -8.31 - - 863 - - - 2067 - 600.00 137.25 0.701 798 -8.7 0.000 - - - - - -