Shilshole 25May23 * SG253 * Dive index * Mission links * Dive 1 * Raw log
prev dive * next dive * dive
• Previous call tries 1 • 0.41 of 575.00 AH used of 24V (99.93% remains)
• Surface angle -36.6 deg, depth 1.16 m • Intended pitch -17.6 deg, speed -10.000 cm/s
VBD pumped to 637.64 (SM_CC=637.77997)
• GPS1 time: 2 s
• GPS2 time: 2 s
• Time spent turning 0 s

Statistics * Plot
t(s) depth(m) w(cm/s) num pts t(s) GC phase pitch roll VBD pit rol VBD volts
ctl(cm) t(s) A pos(AD) rate t(s) A pos(AD) rate ctl(cc) t(s) A pos(AD) rate eff r e r e r e pitrollvbd flags
5 end surface: CONTROL_FINISHED_OK
5 begin dive
6.21 - - - 144.90 VBD -0.88 - - 190.31 - - - 2044.69 - -146.63 126.14 0.005 3401.75 - - - - - - - - - - 16.25
145.49 3.14 -4.13 25 172.22 -0.88 3.01 0.288 584.56 131.0 3.66 0.201 3494.94 396.2 -146.63 7.73 0.008 3696.56 38.1 -2.464 - - - - - - 16.01 15.99 16.26
261 end dive: TARGET_DEPTH_EXCEEDED
262 begin apogee
269.38 46.81 -41.37 47 411.04 -0.20 12.84 0.232 2398.75 141.3 0.05 0.293 2038.38 -29131.2 - 101.49 0.995 3097.22 -5.9 0.046 - - - - - - 16.00 15.83 10.96
412 end apogee: CONTROL_FINISHED_OK
412 begin climb
412.46 48.33 - 71 543.88 0.88 1.13 0.054 2607.81 185.0 3.63 0.122 556.62 -408.2 146.63 107.40 0.957 2494.84 -5.6 0.047 - - - - - - 15.87 15.63 11.28
623 end climb: SURFACE_DEPTH_REACHED
623 begin surface coast
628 end surface coast: CONTROL_FINISHED_OK
628 begin surface
SM 1.27 - - - - 190.4 342.10 0.900 500.6 1.1 16.58 0.185 582.5 35.1 - 3.39 0.068 418.6 122.4 -0.234 - - 11.35 15.71 15.81 -