Shilshole 20Jan21 * SG237 * Dive index * Mission links * Dive 1 * Raw log
prev dive * next dive * dive
• Previous call tries 2 • 3.42 of 510.00 AH used of 24V (99.33% remains)
• Surface angle -63.9 deg, depth 1.09 m • Intended pitch -17.6 deg, speed -10.000 cm/s
VBD pumped to 485.40 (SM_CC=485.50598)
• GPS1 time: 1 s
• GPS2 time: 3 s • Transponder ping count: 18
• Time spent turning 0 s

Statistics * Plot
t(s) depth(m) w(cm/s) num pts t(s) GC phase pitch roll VBD pit rol VBD volts
ctl(cm) t(s) A pos(AD) rate t(s) A pos(AD) rate ctl(cc) t(s) A pos(AD) rate eff r e r e r e pitrollvbd flags
4 end surface: CONTROL_FINISHED_OK
4 begin dive
5.22 - - - 93.58 VBD -1.27 - - 179.62 - - - 2529.00 - -146.63 87.79 0.005 2282.66 - - - - - - - - - - 15.33
93.87 3.09 -2.58 17 139.59 -1.27 10.93 0.305 1492.31 120.1 - - 2528.81 - -146.63 29.73 0.006 3114.25 28.0 -2.404 - - - - - - 15.36 - 15.46
317.19 29.52 -11.77 62 322.54 roll back -1.15 0.22 0.221 1522.88 139.0 1.75 0.182 3185.19 375.1 -146.63 - - 3116.78 - - - - - - - - 15.50 15.40 -
422 end dive: TARGET_DEPTH_EXCEEDED
422 begin apogee
426.96 45.70 -15.59 83 543.37 -0.28 1.52 0.185 1732.62 138.0 0.05 0.287 1914.00 -25423.8 - 113.19 1.074 2517.06 -5.3 0.038 - - - - - - 15.50 15.39 11.68
544 end apogee: CONTROL_FINISHED_OK
544 begin climb
544.40 51.89 - 106 672.41 1.27 2.56 0.132 2110.69 147.7 3.90 0.163 456.88 -373.6 146.63 117.18 1.014 1919.72 -5.1 0.044 - - - - - - 15.49 15.17 11.92
894.95 15.05 10.20 176 900.67 done 1.19 - - 2110.44 - 3.48 0.064 1918.69 420.1 146.63 - - 1912.31 - - - - - - - - - 15.49 -
1079.99 5.88 3.52 213 1198.09 1.50 0.32 0.078 2172.00 192.4 3.81 0.145 457.00 -383.6 286.55 110.29 0.979 1352.94 -5.1 0.005 - - - - - - 15.50 15.25 11.60
1250 end climb: SURFACE_DEPTH_REACHED
1250 begin surface coast
1310 end surface coast: CONTROL_FINISHED_OK
1310 begin surface
SM 1.48 - - - - 180.9 - 0.009 541.2 - 12.79 0.080 543.4 42.5 - 5.05 0.074 538.9 106.0 -0.217 - - 30.36 15.42 15.47 -