Shilshole 14Jan14 * SG601 * Dive index * Mission links
Based on high voltage useage over previous 10 dives:
    dives remaining   : 2615 (99.0 days at current dive duration)
    projected end date: 24-Apr-2014 16:07:25 (to 5% capacity)

Based on low voltage useage over previous 10 dives:
    dives remaining   : 3527 (133.5 days at current dive duration)
    projected end date: 29-May-2014 04:45:06 (to 5% capacity)

High voltage pack usage


Low voltage pack usage