Shilshole 25Jan19 * SG530 * Dive index * Mission links
Based on high voltage useage over previous 7 dives:
    dives remaining   : 2468 (69.8 days at current dive duration)
    projected end date: 05-Apr-2019 17:22:24 (to 15% capacity)

Based on high voltage useage over previous 7 dives:
    dives remaining   : 2468 (69.8 days at current dive duration)
    projected end date: 05-Apr-2019 17:22:24 (to 15% capacity)

High voltage pack usage


Low voltage pack usage