Shilshole 17Mar16 * SG530 * Dive index * Mission links
Based on high voltage useage over previous 3 dives:
    dives remaining   : 1387 (33.1 days at current dive duration)
    projected end date: 19-Apr-2016 21:28:24 (to 15% capacity)

Based on high voltage useage over previous 3 dives:
    dives remaining   : 1387 (33.1 days at current dive duration)
    projected end date: 19-Apr-2016 21:28:24 (to 15% capacity)

High voltage pack usage


Low voltage pack usage