Shilshole 14Apr22 *
SG530 *
Dive index
* Mission links
Based on high voltage usage over previous 4 dives:
dives remaining : 2149 (78.8 days at current dive duration)
projected end date: 02-Jul-2022 15:01:14 (to 15% capacity)
Based on high voltage usage over previous 4 dives:
dives remaining : 2149 (78.8 days at current dive duration)
projected end date: 02-Jul-2022 15:01:14 (to 15% capacity)
Based on fuel gauge from combined packs over previous 4 dives:
dives remaining : 1780 (65.2 days at current dive duration)
projected end date: 19-Jun-2022 01:53:58 (to 15% capacity)
High voltage pack usage
Low voltage pack usage