Shilshole 06Apr22 *
SG530 *
Dive index
* Mission links
Based on high voltage usage over previous 4 dives:
dives remaining : 2105 (71.3 days at current dive duration)
projected end date: 17-Jun-2022 03:33:36 (to 15% capacity)
Based on high voltage usage over previous 4 dives:
dives remaining : 2105 (71.3 days at current dive duration)
projected end date: 17-Jun-2022 03:33:36 (to 15% capacity)
Based on fuel gauge from combined packs over previous 4 dives:
dives remaining : 1773 (60.1 days at current dive duration)
projected end date: 05-Jun-2022 21:25:56 (to 15% capacity)
High voltage pack usage
Low voltage pack usage