Shilshole 14Aug20 * SG527 * Dive index * Mission links
Based on low voltage usage over previous 5 dives:
    dives remaining   : 682 (17.9 days at current dive duration)
    projected end date: 01-Sep-2020 18:09:44 (to 15% capacity)

Based on low voltage usage over previous 5 dives:
    dives remaining   : 682 (17.9 days at current dive duration)
    projected end date: 01-Sep-2020 18:09:44 (to 15% capacity)

High voltage pack usage


Low voltage pack usage