NISKINe Apr19 * SG527 * Dive index * Mission links
Based on low voltage useage over previous 2 dives:
    dives remaining   : 2071 (59.7 days at current dive duration)
    projected end date: 16-Jun-2019 23:29:21 (to 15% capacity)

Based on low voltage useage over previous 2 dives:
    dives remaining   : 2071 (59.7 days at current dive duration)
    projected end date: 16-Jun-2019 23:29:21 (to 15% capacity)

High voltage pack usage


Low voltage pack usage