Shilshole 19Aug10 * SG503 * Dive index * Mission links
Based on low voltage useage over previous 7 dives:
    dives remaining   : 743 (18.3 days at current dive duration)
    projected end date: 07-Sep-2010 06:27:30 (to 5% capacity)

High voltage pack usage


Low voltage pack usage