PortSusan 16Aug04 * SG005 * Dive index * Mission links
Based on high voltage useage over previous 8 dives:
    dives remaining   : 0 (0.0 days at current dive duration)
    projected end date: 18/08/04

High voltage pack usage


Low voltage pack usage