Shilshole 30Apr19 * SG045 * Dive index * Mission links
Based on high voltage useage over previous 10 dives:
    dives remaining   : 893 (45.0 days at current dive duration)
    projected end date: 15-Jun-2019 17:34:09 (to 15% capacity)

Based on low voltage useage over previous 10 dives:
    dives remaining   : 2378 (119.9 days at current dive duration)
    projected end date: 29-Aug-2019 15:07:13 (to 15% capacity)

High voltage pack usage


Low voltage pack usage