Shilshole 29Nov17 * SG042 * Dive index * Mission links
Based on high voltage useage over previous 11 dives:
    dives remaining   : 805 (39.3 days at current dive duration)
    projected end date: 09-Jan-2018 00:32:19 (to 15% capacity)

Based on low voltage useage over previous 11 dives:
    dives remaining   : 1695 (82.8 days at current dive duration)
    projected end date: 21-Feb-2018 12:24:35 (to 15% capacity)

High voltage pack usage


Low voltage pack usage