Shilshole 08Mar17 * SG041 * Dive index * Mission links
Based on low voltage useage over previous 10 dives:
    dives remaining   : 1280 (57.3 days at current dive duration)
    projected end date: 06-May-2017 00:19:38 (to 15% capacity)

Based on high voltage useage over previous 10 dives:
    dives remaining   : 1415 (63.4 days at current dive duration)
    projected end date: 12-May-2017 01:28:16 (to 15% capacity)

High voltage pack usage


Low voltage pack usage