Shilshole 30Apr18 * SG403 * Dive index * Mission links
Based on high voltage useage over previous 10 dives:
    dives remaining   : 2499 (81.5 days at current dive duration)
    projected end date: 22-Jul-2018 05:50:40 (to 15% capacity)

Based on low voltage useage over previous 10 dives:
    dives remaining   : 3907 (127.4 days at current dive duration)
    projected end date: 06-Sep-2018 04:02:05 (to 15% capacity)

High voltage pack usage


Low voltage pack usage