Shilshole 11Apr18 * SG403 * Dive index * Mission links
Based on high voltage useage over previous 10 dives:
    dives remaining   : 2128 (102.3 days at current dive duration)
    projected end date: 23-Jul-2018 23:23:33 (to 15% capacity)

Based on low voltage useage over previous 10 dives:
    dives remaining   : 2447 (117.6 days at current dive duration)
    projected end date: 08-Aug-2018 07:17:17 (to 15% capacity)

High voltage pack usage


Low voltage pack usage