Shilshole 19Jun17 * SG402 * Dive index * Mission links
Based on low voltage useage over previous 2 dives:
    dives remaining   : 2639 (42.9 days at current dive duration)
    projected end date: 01-Aug-2017 16:38:11 (to 15% capacity)

Based on high voltage useage over previous 2 dives:
    dives remaining   : 3838 (62.4 days at current dive duration)
    projected end date: 21-Aug-2017 04:34:46 (to 15% capacity)

High voltage pack usage


Low voltage pack usage