Shilshole 26Jan17 * SG401 * Dive index * Mission links
Based on low voltage useage over previous 4 dives:
    dives remaining   : 3215 (47.3 days at current dive duration)
    projected end date: 15-Mar-2017 03:06:31 (to 15% capacity)

Based on high voltage useage over previous 4 dives:
    dives remaining   : 5192 (76.4 days at current dive duration)
    projected end date: 13-Apr-2017 05:05:58 (to 15% capacity)

High voltage pack usage


Low voltage pack usage