LakeWA Sep16 * SG401 * Dive index * Mission links
Based on high voltage useage over previous 5 dives:
    dives remaining   : 0 (0.0 days at current dive duration)
    projected end date: 26-Sep-2016 22:41:57 (to 15% capacity)

Based on high voltage useage over previous 5 dives:
    dives remaining   : 0 (0.0 days at current dive duration)
    projected end date: 26-Sep-2016 22:41:57 (to 15% capacity)

High voltage pack usage


Low voltage pack usage