LakeWA 31Oct16 * SG401 * Dive index * Mission links
Based on high voltage useage over previous 6 dives:
    dives remaining   : 3413 (67.3 days at current dive duration)
    projected end date: 07-Jan-2017 04:20:42 (to 15% capacity)

Based on low voltage useage over previous 6 dives:
    dives remaining   : 3510 (69.2 days at current dive duration)
    projected end date: 09-Jan-2017 02:13:53 (to 15% capacity)

High voltage pack usage


Low voltage pack usage