LakeWA 27Sep16 * SG401 * Dive index * Mission links
Based on high voltage useage over previous 10 dives:
    dives remaining   : 4167 (52.1 days at current dive duration)
    projected end date: 26-Nov-2016 23:16:16 (to 15% capacity)

Based on low voltage useage over previous 10 dives:
    dives remaining   : 6140 (76.7 days at current dive duration)
    projected end date: 21-Dec-2016 15:00:24 (to 15% capacity)

High voltage pack usage


Low voltage pack usage