LakeWA 08Nov16 * SG401 * Dive index * Mission links
Based on low voltage useage over previous 10 dives:
    dives remaining   : 4568 (83.8 days at current dive duration)
    projected end date: 31-Jan-2017 17:24:55 (to 15% capacity)

Based on high voltage useage over previous 10 dives:
    dives remaining   : 5171 (94.8 days at current dive duration)
    projected end date: 11-Feb-2017 18:46:07 (to 15% capacity)

High voltage pack usage


Low voltage pack usage