Shilshole 30May18 * SG040 * Dive index * Mission links
Based on high voltage useage over previous 5 dives:
    dives remaining   : 822 (23.0 days at current dive duration)
    projected end date: 22-Jun-2018 21:10:59 (to 15% capacity)

Based on low voltage useage over previous 5 dives:
    dives remaining   : 2281 (63.7 days at current dive duration)
    projected end date: 02-Aug-2018 15:31:25 (to 15% capacity)

High voltage pack usage


Low voltage pack usage