Shilshole 21Apr17 * SG040 * Dive index * Mission links
Based on high voltage useage over previous 3 dives:
    dives remaining   : 921 (31.0 days at current dive duration)
    projected end date: 22-May-2017 22:31:13 (to 15% capacity)

Based on low voltage useage over previous 3 dives:
    dives remaining   : 2609 (87.9 days at current dive duration)
    projected end date: 18-Jul-2017 19:27:21 (to 15% capacity)

High voltage pack usage


Low voltage pack usage