Shilshole 08Mar17 * SG040 * Dive index * Mission links
Based on high voltage useage over previous 10 dives:
    dives remaining   : 1253 (42.5 days at current dive duration)
    projected end date: 21-Apr-2017 04:24:21 (to 15% capacity)

Based on low voltage useage over previous 10 dives:
    dives remaining   : 2944 (99.8 days at current dive duration)
    projected end date: 17-Jun-2017 12:35:53 (to 15% capacity)

High voltage pack usage


Low voltage pack usage