Shilshole 07Jul17 * SG040 * Dive index * Mission links
Based on high voltage useage over previous 5 dives:
    dives remaining   : 881 (32.7 days at current dive duration)
    projected end date: 09-Aug-2017 16:18:59 (to 15% capacity)

Based on low voltage useage over previous 5 dives:
    dives remaining   : 1728 (64.2 days at current dive duration)
    projected end date: 10-Sep-2017 03:30:40 (to 15% capacity)

High voltage pack usage


Low voltage pack usage