Shilshole 09Apr19 * SG039 * Dive index * Mission links
Based on high voltage useage over previous 10 dives:
    dives remaining   : 746 (34.3 days at current dive duration)
    projected end date: 15-May-2019 00:48:58 (to 15% capacity)

Based on low voltage useage over previous 10 dives:
    dives remaining   : 2866 (131.9 days at current dive duration)
    projected end date: 20-Aug-2019 14:14:18 (to 15% capacity)

High voltage pack usage


Low voltage pack usage