Shilshole 30Apr19 * SG037 * Dive index * Mission links
Based on high voltage useage over previous 10 dives:
    dives remaining   : 276 (15.8 days at current dive duration)
    projected end date: 17-May-2019 10:42:23 (to 15% capacity)

Based on low voltage useage over previous 10 dives:
    dives remaining   : 847 (48.4 days at current dive duration)
    projected end date: 19-Jun-2019 01:57:35 (to 15% capacity)

High voltage pack usage


Low voltage pack usage