Shilshole 13Nov14 * SG035 * Dive index * Mission links
Based on high voltage useage over previous 2 dives:
    dives remaining   : 634 (13.8 days at current dive duration)
    projected end date: 27-Nov-2014 15:43:04 (to 15% capacity)

Based on low voltage useage over previous 2 dives:
    dives remaining   : 3611 (78.6 days at current dive duration)
    projected end date: 31-Jan-2015 11:12:01 (to 15% capacity)

High voltage pack usage


Low voltage pack usage