Shilshole 05Feb14 * SG035 * Dive index * Mission links
Based on high voltage useage over previous 5 dives:
    dives remaining   : 659 (22.1 days at current dive duration)
    projected end date: 28-Feb-2014 02:17:51 (to 5% capacity)

Based on low voltage useage over previous 5 dives:
    dives remaining   : 3460 (116.0 days at current dive duration)
    projected end date: 01-Jun-2014 23:42:07 (to 5% capacity)

High voltage pack usage


Low voltage pack usage