Shilshole 25May23 *
SG252 *
Dive index
* Mission links
Based on high voltage usage over previous 3 dives:
dives remaining : 2493 (74.2 days at current dive duration)
projected end date: 07-Aug-2023 22:11:43 (to 15% capacity)
Based on high voltage usage over previous 3 dives:
dives remaining : 2493 (74.2 days at current dive duration)
projected end date: 07-Aug-2023 22:11:43 (to 15% capacity)
Based on fuel gauge from combined packs over previous 3 dives:
dives remaining : 2064 (61.4 days at current dive duration)
projected end date: 26-Jul-2023 03:36:28 (to 15% capacity)
High voltage pack usage
Low voltage pack usage