Shilshole 29Mar22 *
SG248 *
Dive index
* Mission links
Based on high voltage usage over previous 5 dives:
dives remaining : 2654 (98.4 days at current dive duration)
projected end date: 06-Jul-2022 07:32:48 (to 15% capacity)
Based on high voltage usage over previous 5 dives:
dives remaining : 2654 (98.4 days at current dive duration)
projected end date: 06-Jul-2022 07:32:48 (to 15% capacity)
Based on fuel gauge from combined packs over previous 5 dives:
dives remaining : 2413 (89.5 days at current dive duration)
projected end date: 27-Jun-2022 08:56:53 (to 15% capacity)
High voltage pack usage
Low voltage pack usage