Shilshole 16Mar22 *
SG240 *
Dive index
* Mission links
Based on high voltage usage over previous 6 dives:
dives remaining : 3023 (93.5 days at current dive duration)
projected end date: 18-Jun-2022 10:04:33 (to 15% capacity)
Based on high voltage usage over previous 6 dives:
dives remaining : 3023 (93.5 days at current dive duration)
projected end date: 18-Jun-2022 10:04:33 (to 15% capacity)
Based on fuel gauge from combined packs over previous 6 dives:
dives remaining : 3201 (99.0 days at current dive duration)
projected end date: 23-Jun-2022 21:59:24 (to 15% capacity)
High voltage pack usage
Low voltage pack usage