Shilshole 18Nov22 *
SG236 *
Dive index
* Mission links
Based on high voltage usage over previous 5 dives:
dives remaining : 2592 (98.5 days at current dive duration)
projected end date: 25-Feb-2023 10:48:08 (to 15% capacity)
Based on high voltage usage over previous 5 dives:
dives remaining : 2592 (98.5 days at current dive duration)
projected end date: 25-Feb-2023 10:48:08 (to 15% capacity)
Based on fuel gauge from combined packs over previous 5 dives:
dives remaining : 2379 (90.4 days at current dive duration)
projected end date: 17-Feb-2023 08:41:49 (to 15% capacity)
High voltage pack usage
Low voltage pack usage