Shilshole 08Apr21 *
SG235 *
Dive index
* Mission links
Based on high voltage usage over previous 5 dives:
dives remaining : 1692 (58.6 days at current dive duration)
projected end date: 06-Jun-2021 11:14:19 (to 15% capacity)
Based on high voltage usage over previous 5 dives:
dives remaining : 1692 (58.6 days at current dive duration)
projected end date: 06-Jun-2021 11:14:19 (to 15% capacity)
Based on fuel gauge from combined packs over previous 5 dives:
dives remaining : 1141 (39.5 days at current dive duration)
projected end date: 18-May-2021 08:59:54 (to 15% capacity)
High voltage pack usage
Low voltage pack usage