Shilshole 02Jun21 *
SG235 *
Dive index
* Mission links
Based on high voltage usage over previous 3 dives:
dives remaining : 1741 (61.4 days at current dive duration)
projected end date: 03-Aug-2021 04:34:20 (to 15% capacity)
Based on high voltage usage over previous 3 dives:
dives remaining : 1741 (61.4 days at current dive duration)
projected end date: 03-Aug-2021 04:34:20 (to 15% capacity)
Based on fuel gauge from combined packs over previous 3 dives:
dives remaining : 1059 (37.3 days at current dive duration)
projected end date: 10-Jul-2021 03:25:21 (to 15% capacity)
High voltage pack usage
Low voltage pack usage