Shilshole 22Jun22 *
SG234 *
Dive index
* Mission links
Based on high voltage usage over previous 5 dives:
dives remaining : 2124 (78.4 days at current dive duration)
projected end date: 09-Sep-2022 08:04:29 (to 15% capacity)
Based on high voltage usage over previous 5 dives:
dives remaining : 2124 (78.4 days at current dive duration)
projected end date: 09-Sep-2022 08:04:29 (to 15% capacity)
Based on fuel gauge from combined packs over previous 5 dives:
dives remaining : 1881 (69.4 days at current dive duration)
projected end date: 31-Aug-2022 08:24:10 (to 15% capacity)
High voltage pack usage
Low voltage pack usage