Shilshole 10Aug18 * SG227 * Dive index * Mission links
Based on high voltage useage over previous 5 dives:
    dives remaining   : 2944 (82.4 days at current dive duration)
    projected end date: 01-Nov-2018 07:16:36 (to 15% capacity)

Based on high voltage useage over previous 5 dives:
    dives remaining   : 2944 (82.4 days at current dive duration)
    projected end date: 01-Nov-2018 07:16:36 (to 15% capacity)

High voltage pack usage


Low voltage pack usage