Shilshole 21May21 *
SG226 *
Dive index
* Mission links
Based on high voltage usage over previous 6 dives:
dives remaining : 2274 (70.1 days at current dive duration)
projected end date: 31-Jul-2021 01:07:52 (to 15% capacity)
Based on high voltage usage over previous 6 dives:
dives remaining : 2274 (70.1 days at current dive duration)
projected end date: 31-Jul-2021 01:07:52 (to 15% capacity)
Based on fuel gauge from combined packs over previous 6 dives:
dives remaining : 2310 (71.2 days at current dive duration)
projected end date: 01-Aug-2021 03:37:05 (to 15% capacity)
High voltage pack usage
Low voltage pack usage