Shilshole 26Jul16 * SG220 * Dive index * Mission links
Based on high voltage useage over previous 6 dives:
    dives remaining   : 1976 (64.6 days at current dive duration)
    projected end date: 29-Sep-2016 13:12:42 (to 15% capacity)

Based on high voltage useage over previous 6 dives:
    dives remaining   : 1976 (64.6 days at current dive duration)
    projected end date: 29-Sep-2016 13:12:42 (to 15% capacity)

High voltage pack usage


Low voltage pack usage