SMODE Mar23 *
SG220 *
Dive index
* Mission links
220 * 247
Based on high voltage usage over previous 10 dives:
dives remaining : 354 (49.9 days at current dive duration)
projected end date: 25-Aug-2023 12:17:26 (to 15% capacity)
Based on high voltage usage over previous 10 dives:
dives remaining : 354 (49.9 days at current dive duration)
projected end date: 25-Aug-2023 12:17:26 (to 15% capacity)
Based on fuel gauge from combined packs over previous 10 dives:
dives remaining : 1 (0.1 days at current dive duration)
projected end date: 06-Jul-2023 16:38:26 (to 15% capacity)
High voltage pack usage
Low voltage pack usage