Shilshole 06Jul18 * SG219 * Dive index * Mission links
Based on high voltage useage over previous 3 dives:
    dives remaining   : 1988 (60.4 days at current dive duration)
    projected end date: 05-Sep-2018 03:43:10 (to 15% capacity)

Based on high voltage useage over previous 3 dives:
    dives remaining   : 1988 (60.4 days at current dive duration)
    projected end date: 05-Sep-2018 03:43:10 (to 15% capacity)

High voltage pack usage


Low voltage pack usage