Shilshole 13Jul16 * SG216 * Dive index * Mission links
Based on low voltage useage over previous 10 dives:
    dives remaining   : 834 (26.8 days at current dive duration)
    projected end date: 10-Aug-2016 11:52:42 (to 15% capacity)

Based on high voltage useage over previous 10 dives:
    dives remaining   : 903 (29.0 days at current dive duration)
    projected end date: 12-Aug-2016 17:05:20 (to 15% capacity)

High voltage pack usage


Low voltage pack usage