Shilshole 04Mar14.01 * SG215 * Dive index * Mission links
Based on low voltage useage over previous 10 dives:
    dives remaining   : 1301 (48.2 days at current dive duration)
    projected end date: 22-Apr-2014 23:57:21 (to 15% capacity)

Based on high voltage useage over previous 10 dives:
    dives remaining   : 1868 (69.2 days at current dive duration)
    projected end date: 14-May-2014 00:10:35 (to 15% capacity)

High voltage pack usage


Low voltage pack usage