Shilshole 04Mar14.01 * SG213 * Dive index * Mission links
Based on low voltage useage over previous 10 dives:
    dives remaining   : 1615 (59.2 days at current dive duration)
    projected end date: 03-May-2014 21:13:33 (to 15% capacity)

Based on high voltage useage over previous 10 dives:
    dives remaining   : 2187 (80.1 days at current dive duration)
    projected end date: 24-May-2014 20:18:00 (to 15% capacity)

High voltage pack usage


Low voltage pack usage