Shilshole 22Dec15 * SG211 * Dive index * Mission links
Based on low voltage useage over previous 4 dives:
    dives remaining   : 1582 (39.4 days at current dive duration)
    projected end date: 01-Apr-2015 07:15:14 (to 15% capacity)

Based on high voltage useage over previous 4 dives:
    dives remaining   : 2258 (56.2 days at current dive duration)
    projected end date: 18-Apr-2015 03:04:12 (to 15% capacity)

High voltage pack usage


Low voltage pack usage