Shilshole 04Mar14 * SG211 * Dive index * Mission links
Based on low voltage useage over previous 10 dives:
    dives remaining   : 864 (40.3 days at current dive duration)
    projected end date: 15-Apr-2014 00:48:40 (to 15% capacity)

Based on high voltage useage over previous 10 dives:
    dives remaining   : 1019 (47.6 days at current dive duration)
    projected end date: 22-Apr-2014 06:28:17 (to 15% capacity)

High voltage pack usage


Low voltage pack usage